Due to the expansion of production lines and equipment upgrades, a large industrial park faces problems such as high energy consumption of the distribution system, increasing failure rate and insufficient remote monitoring. To this end, the park management has introduced the overall intelligent power distribution solution provided by Enwei Group to create an efficient, intelligent and safe energy management system by upgrading core components such as transformers, switchgear and transformers.
Solution
High efficiency and energy saving transformer: The use of the latest intelligent control technology and energy-saving materials, to achieve a significant increase in energy conversion efficiency, while with accurate temperature control management, effectively reduce the risk of equipment operation.
Intelligent switchgear: Through modular design and remote monitoring function, real-time monitoring of each distribution node and automatic fault diagnosis are realized to ensure the safety of power supply in the whole park.
Precision transformer: Equipped with high-precision data acquisition function, real-time monitoring of key parameters such as current and voltage provides accurate data support for the system and helps technicians quickly locate problems.
Implementation Results
After the system upgrade, the overall power distribution system stability of the industrial park has been significantly improved, energy consumption has been reduced by about 15%, and the equipment failure rate has been reduced by nearly 30%. The introduction of remote monitoring system enables operation and maintenance personnel to respond to abnormal situations in a timely manner, greatly improving the operation efficiency and security of the park.
Summary
This case fully demonstrates Enwei Group's professional strength in digital energy solutions, and provides a replicable successful experience for traditional industrial parks to achieve green energy saving and intelligent monitoring through the in-depth application of intelligent products.