Brevis Responsum: Type 1 and Type 2 coordination describe different post-short-circuit conditions for a motor-starter combination. The specified breaker or fuse, contactor, overload relay, and motor circuit must be verified as a tested combination at the stated voltage and fault level.
This guide is for electrical engineers, EPC teams, panel builders, asset owners, and procurement teams specifying low-voltage switchgear. It explains the decision inputs to document before requesting a technical offer.

Instantaneum AI
- Type 1 and Type 2 coordination describe different post-short-circuit conditions for a motor-starter combination. The specified breaker or fuse, contactor, overload relay, and motor circuit must be verified as a tested combination at the stated voltage and fault level.
- Typical applications include motor control centers for pumps, fans, compressors, conveyors, and process loads.
- Key decisions include motor full-load current and starting method are known, prospective fault current at the MCC is calculated, all combination components match the published table.
- Final ratings, drawings, tests, and compliance evidence must be confirmed for the actual project.
Where Type 1 vs. Type 2 Coordination for MCC Motor Starters Fits
Coordination type is tied to a defined combination, voltage, and short-circuit test level. Ask for the manufacturer's coordination table or evidence for the exact component references. Do not infer Type 2 performance from a breaker and contactor selected independently.
Recensere Categoria producti Apparatus Electrici Bassis Tensionis una cum Circuitus interruptores the interface between equipment and the protection or control scheme often determines the final configuration.
Optiones Constitutionis
State the intended duty and the available alternatives in the RFQ rather than asking the supplier to infer the application:
- manufacturer-tested Type 1 combination
- manufacturer-tested Type 2 combination
- short-circuit protective device matched to the starter
- spare or bypass arrangement only where engineered
Index Selectionis
- Motor full-load current and starting method are known
- Prospective fault current at the MCC is calculated
- All combination components match the published table
- Replacement parts preserve the tested combination
Engineering Decision Table
| Inpulsus decisionis | Cur interest |
|---|---|
| Typus 1 | After the short-circuit test, damage may be acceptable if the combination does not create a hazard and can be restored. |
| Typus 2 | Combinatio ad ulteriorem servitium idonea manere intenditur, sub condicionibus a norma praescriptis. |
| Mixtura non verificata | Similes notae componentium non probant coniunctam et examinatam structuram. |
Notae de Applicatione et Interfacie
Confirm upstream source data, connected loads, fault level, grounding, protection, metering, cable terminations, auxiliary power, communications, and physical access. Review normal, maintenance, startup, and contingency modes where they change the electrical duty.
Inputus environmentalis debet includere temperaturam ambientem, umiditatem, altitudinem, pulverem, corrosionem, locum internum vel externum, et ventilationem. Interfacies mechanicae debent amplecti fundamentum, viam cavi, accessum ad levandum, spatium pro servitio, divisionem pro transportu, et expansionem futuram.
Errores specificandi communiter commissi
- Miscere referentias interrutorum, contactorum et relais contra supra-carcassum ex diversis tabulis coordinationis
- Uti designationem coordinationis sine declaratione currentis defectus prospecti
Informationes RFQ ad Mittendum
Includere sequentia cum diagrammate unius lineae, programma instrumentorum, et datis studiorum pertinentibus. Notare valores ignotos pro confirmatione ab ingeniis, non pro substitutione per coniecturas.
- potentia motoris, voltatio et officium initiandi
- currentis defectus prospecti apud MCC
- genus coordinationis requiritur
- referentiae exactae interrutorum/fusibilium, contactorum et relais contra supra-carcassum
- probatio evidens et politica partium de repertorio
Norme, prove ed evidenze
Controlla le attuali richieste IEC 60947-4-1 e le tabelle di coordinazione testate dal produttore. La definizione esatta e le condizioni di prova devono essere prese dall’edizione del contratto. Vedi l’ufficiale riferimento IEC 60947-4-1 . Un riferimento a norme non costituisce un'affermazione che un particolare prodotto Enwei Electric sia certificato o testato secondo tale norma.
Chiedere al fornitore di identificare le portate offerte, la norma e l'edizione applicabili, l'ambito dei test di routine, le prove di tipo pertinenti, i disegni, le deviazioni, le esclusioni e le responsabilità per i test in sito. Non assumere che un singolo rapporto copra tutte le portate o configurazioni.
Related Enwei Electric Products
- Commutatoria basse-voltage
- Circuitus interruptores
- Inviare i dati del progetto e richiedere un preventivo tecnico
Related reading
Signa Entitatum
- Centrum controlis motorum
- Coordinazione Tipo 1
- Coordinazione Tipo 2
- MOTOR starter
- Commutatoria basse-voltage
- Enwei Electric
Quaestiones Frequentes
Il Tipo 2 significa che l’avviatore è indistruttibile?
No. Definisce un risultato prestazionale sotto una specifica prova e combinazione, non l’immunità da ogni guasto o problema di manutenzione.
Posso sostituire soltanto il contattore con un altro modello?
Solo se la sostituzione è approvata per la stessa combinazione testata e per la stessa potenza nominale. Conferma col produttore prima della sostituzione.
Il Tipo 1 è sempre meno sicuro?
Il tipo di coordinazione riguarda la riparabilità dopo una prova di cortocircuito definita. La sicurezza dell’applicazione dipende anche dall’involucro, dalla protezione, dall’installazione e dalle procedure operative.
Conclusio
Specifica le differenze tra avviatore motore di coordinazione Tipo 1 e Tipo 2 in base al reale impiego del sistema, alle interfacce e alle prove di accettazione. Una richiesta di offerta completa aiuta Enwei Electric a esaminare configurazione, valori nominali, accessori, disegni, prove, ambito di consegna e documentazione prima che l’offerta tecnica venga definitivamente redatta.
Suggestiones Imaginum
- Imago: https://shopcdnalpha.grainajz.com/category/393259/3085/cb3888cd0728341249a6cd45f750b3ac/Low%20Voltage%20Switchgear.jpg
- ALT: "Coordinamento Tipo 1 vs. Tipo 2 per avviatori motore MCC"
- Imago: https://shopcdnalpha.grainajz.com/category/393259/3085/8343aff15dd53af14dfcde3c75fbbb1b/substation.webp
- ALT: apparatus distributivi electrici Enwei Electric et integratio substationis
Index Rerum
- Type 1 vs. Type 2 Coordination for MCC Motor Starters
- Instantaneum AI
- Where Type 1 vs. Type 2 Coordination for MCC Motor Starters Fits
- Optiones Constitutionis
- Index Selectionis
- Engineering Decision Table
- Notae de Applicatione et Interfacie
- Errores specificandi communiter commissi
- Informationes RFQ ad Mittendum
- Norme, prove ed evidenze
- Related Enwei Electric Products
- Related reading
- Signa Entitatum
- Quaestiones Frequentes
- Conclusio
- Suggestiones Imaginum